https://www.miningweekly.com

Ncondezi coal-to-power project, Mozambique

24th January 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Ncondezi coal-to-power project.

Location
The 38 700 ha Ncondezi licence area is located in Mozambique's coal-bearing Tete province, one of the largest undeveloped coal mining regions in the world.

Project Owner/s
Ncondezi Energy.

Project Description
Ncondezi's Joint Ore Reserves Committee-compliant coal resource amounts to 4.7-billion tons, permitting a large and long operation. The Phase 1 power plant will use Mozambique’s present transmission network, reinforced, to carry its output to users. Only about 20% of the country is currently electrified, and the acceleration and expansion of electrification have become government policy.

The Ncondezi mine forms part of the integrated thermal coal mine and power plant project. The power station is expected to initially produce 300 MW, of which 60 MW will be used to operate the power plant, and 240 MW will be supplied to the northern electricity grid for use by users across Tete.

Being built in phases, the power plant project has been designed to be scalable up to a planned maximum capacity of 1 800 MW.

The Ncondezi mine will be the base for the project, and the power plant will be located on the mining concession. The mine will be able to supply 1.1-million tons of coal a year, with an energy-producing capacity of 18.66 MJ/kg for 25 years.

The openpit mine will be 2 km away from the power plant and will have a lifetime capacity of 4.8-billion tons of coal. The coal from the mine – still at a lower quality than export-grade thermal coal – will have to be processed to achieve the desired grade of 18.66 MJ/kg before it can be used by the Ncondezi power plant.

Ncondezi Energy will consider exporting coal when the price of seaborne coal and access to rail and port infrastructure improve in the future.

Some of the other lower-quality coal from the surrounding mines in Tete might also be used to bolster the power station’s coal supply.

Potential Job Creation
During the construction of the Ncondezi power plant and mine, about 2 000 jobs will be created. Once construction of the mine is completed, it will provide 50 permanent jobs while the power plant will provide more than 200 permanent positions.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The estimated cost of the power plant is $1-billion and that of the mine between $60-million and $80-million.

Planned Start /End Date
Ncondezi aims to deliver the first power from the project in 2023.

Latest Developments
Ncondezi Energy is on track to submit a tariff financial model for its integrated 300 MW coal-fired power project and coal mine to strategic partners at the end of January.

The company is targeting a competitive tariff rate in line with tariff rates recently agreed with Electricidade de Moçambique.

The supporting engineering, procurement and construction information has been received and is under review by Ncondezi’s technical team.

Moreover, the supporting operations and maintenance information is currently under optimisation process with strategic partners.

Target tariff negotiation finalisation is expected during the first half of this year.

Key Contracts and Suppliers
KPMG (mine feasibility study), Impacto and Environmental Resources Management Southern Africa (environmental- and social-impact assessment) and the Mineral Corporation (geological consultant).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
NPC, tel +44 20 7183 5402 or email info@ncondezicoal.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ASTPM
ASTPM

Established in 1983, the ASTPM is an industry association and representative body of the welded carbon steel tube and pipe manufacturers of South...

VISIT SHOWROOM 
Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.044 0.6s - 111pq - 2rq
Subscribe Now