Muga potash project, Spain
Name of the Project
Muga potash project.
Location
The project is located in the communities of Undués de Lerda and Urriés, (Aragón), and Sangüesa and Javier (Navarra), in Spain.
Client
Highfield Resources.
Project Description
A revised plan has proposed a two-phased development of the Muga project, with average production in the first phase estimated at 500 000 t/y of muriate of potash (MoP) and one-million tonnes of MoP in the second phase.
The revised mine plan yields an estimated mine life of 27 years, comprising about 18 years of mine life from Muga measured and indicated resources, and a further nine years from Muga inferred tonnes and the Vipasca exploration target.
Muga has estimated measured and indicated resources of 235-million tonnes grading 12.35% potassium oxide (K2O) and inferred resources of 32-million tonnes. The Vipasca exploration target has estimated resources of 127-million to 255-million tonnes grading 12% K2O to 16% K2O. Underground access will be by twin parallel declines from surface over 2.6 km to a depth of about 350 m.
The primary production method will be room and pillar, with an advancing chevron pattern approach suited to potash mining.
Processing will be by conventional flotation featuring a two-stage crushing process, attrition scrubbing and a hydrocyclone desliming facility with a potassium chloride froth flotation circuit, supplemented by a crystalliser circuit.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated net present value, at an 8% discount rate, of €1.16-billion and an internal rate of return of 23%.
Value
Phase 1 will cost about €342-million to implement and Phase 2 €199-million.
Duration
The project is expected to start about one year after the receipt of the environmental permit to allow for sufficient time to secure all the necessary construction permits.
Latest Developments
None stated.
Key Contracts and Suppliers
SRK (revised mine plan), Acciona Infrastructure (construction contractor).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Highfield Resources tel +34 948 050 577.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation