https://www.miningweekly.com
Design|Engineering|Infrastructure|PROJECT|Infrastructure
Design|Engineering|Infrastructure|PROJECT|Infrastructure
design|engineering|infrastructure|project|infrastructure

Mt Peak FEED delayed by Covid-19

31st March 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed TNG has warned that Covid-19 was likely to impact its Mt Peake vanadium/titanium/iron project, in the Northern Territory.

TNG noted on Tuesday that Mt Peak was at an advanced stage of pre-development planning, with the front-end engineering design (FEED) study progressing in parallel with design and tendering for the supporting non-process infrastructure.

With the measures now being taken to contain the spread of Covid-19, TNG has reviewed the status of the FEED study and the planned next steps to progress Mt Peake. The company noted that while key work streams related to the design and engineering have experienced limited disruption to date, a range of other supporting FEED workstreams have been impacted by temporary shutdowns, and would be deferred for the time being.

TNG told shareholders that the timing of the FEED study completion would likely be impacted, but subject to the rapidly changing global situation, no other major delay was forecast.

Previous studies at Mt Peak have found that a two-million tonne-a-year operation, delivering 100 000 t/y of titanium dioxide pigment, would require a capital investment of some A$824-million, with a mine-life expectancy of 37 years.

Edited by Creamer Media Reporter

Comments

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.102 0.137s - 90pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: