Mt Garnet tin project, Australia
Name and Location
Mt Garnet tin project, Queensland, Australia.
Client
Consolidated Tin Mines.
Project Description
The Mt Garnet project will initially comprise three key deposits – Gillian, Pinnacles and Windermere.
The project has a total Joint Ore Reserves Committee-compliant resource of 13.12-million tonnes, grading 0.39% tin, 22.87% iron, 5.8% fluoride and a tin equivalent of 0.56%. This includes 1.1-million tonnes at 0.73% tin in the measured category at the Gillian deposit.
A prefeasibility study (PFS) completed on the Mt Garnet project, in North Queensland, has demonstrated the project’s economic and technical development potential.
The PFS is based on a one-million-tonne-a-year openpit operation, delivering ore to a one-million-tonne-a-year conventional flotation concentrator, which will remove the silica content before the ore is processed by means of conventional tin fuming using a rotary kiln.
The Mt Garnet concentrator is expected to produce an estimated 2 944 t/y of tin in concentrate at 68% tin, 234 970 t/y of iron in concentrate at 65% iron and 53 860 t/y of fluorite at 86% calcium fluoride in concentrate over a nine-year mine life.
Value
Total estimated capital to first production is A$76-million.
Duration
The aim is to achieve tin production by the end of 2014.
Latest Developments
Consolidated Tin has declared commercial copper production at the Mt Garnet concentrator, in Queensland.
Consolidated Tin has a 9.85% free carry interest in Snow Peak Mining’s Surveyor project and it manages the project, which includes the Mt Garnet concentrator.
Tin processing equipment will be introduced into the Mt Garnet concentrator to enable Consolidated Tin to start production from its own Mt Garnet tin project. It is expected that about one-million tonnes a year of tin ore will be processed at the concentrator.
Meanwhile, Consolidated Tin is continuing to progress the definitive feasibility study for the Gillian deposit, at Mt Garnet, and to progress its memorandum of understanding with Snow Peak regarding the ore treatment.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Consolidated Tin Mines, tel +61 7 4032 3319 or email info@csdtin.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















