Mt Garnet tin project, Australia
Name and Location
Mt Garnet tin project, Queensland, Australia.
Client
Consolidated Tin Mines.
Project Description
The Mt Garnet project has a Joint Ore Reserves Committee-compliant resource of 13.12-million tonnes, grading 0.39% tin, 22.87% iron, 5.8% fluoride and a tin equivalent of 0.56%.
A prefeasibility study (PFS) completed on the Mt Garnet project, in North Queensland, has demonstrated the project’s economic and technical development potential.
The PFS is based on a one-million-tonne-a-year openpit operation, delivering ore to a one-million-tonne-a-year conventional flotation concentrator, which will remove the silica content before the ore is processed by means of conventional tin fuming using a rotary kiln.
The Mt Garnet concentrator is expected to produce an estimated 2 944 t/y of tin in concentrate at 68% tin, and 234 970 t/y of iron in concentrate at 65% iron, and 53 860 t/y of fluorite at 86% calcium fluoride in concentrate, over a nine-year mine life.
Value
Total estimated capital to first production is A$76-million.
Duration
The aim is to achieve tin production by the end of 2014.
Latest Developments
Based on the positive outcomes of the PFS and opportunities that exist to significantly enhance the PFS cost base through project optimisation, Consolidated Tin has approved the immediate initiation of a definitive feasibility study on the Mt Garnet project.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Consolidated Tin Mines, tel +61 7 4032 3319 or email info@csdtin.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















