https://www.miningweekly.com

Montepuez graphite project, Mozambique

5th October 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Montepuez graphite project.

Location
Mozambique.

Client
Battery Minerals.

Project Description
Montepuez Stage 1 (M1) is a 50 000 t/y graphite flake project. 

The current project life is 20 years, which Battery Minerals expects to expand to about 100 000 t/y in Stage 2. 

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $146-million and an internal rate of return of 36.2%. Payback has been reduced from 4.75 years in the definitive feasibility study (DFS) to two years in the value engineering study (VES).

Value
Total capital expenditure in the VES is estimated at $42.33-million, compared with $126-million in the February 2017 DFS.

Duration
Steady-state production is expected in the final quarter of 2019.

Complete ramp-up of the first stage of the mine is expected in the third quarter of 2019.

Latest Developments
The development of the Montepuez graphite project, in Mozambique, is progressing well and the funding strategy has also advanced, Battery Minerals has reported.

The company has said that key construction milestones at the project are being met. The construction of the permanent 100-person accommodation camp and the tailings storage facility is well advanced.

Battery Minerals has appointed Origin Capital as financial adviser to advance its funding efforts for the mine. Origin is seeking expressions of interest from potential debt providers.

As part of the funding process, independent technical consultant Behre Dolbear Australia has been appointed to conduct a technical due diligence review, which has included a recent site visit.

Benchmark Mineral Intelligence will provide an independent review of the graphite market and a specific analysis of Montepuez’s position on the industry cost curve.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Battery Minerals, tel +61 8 9322 7600, fax +61 8 9322 7602 or email info@batteryminerals.com.

 

 

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Schauenburg SmartMine IoT
Schauenburg SmartMine IoT

SmartMine IoT has been developed with the mining industry in mind, to provides our customers with powerful business intelligence and data modelling...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.051 0.894s - 111pq - 2rq
Subscribe Now