https://www.miningweekly.com

MMG halts gold production in Laos

18th November 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Metals miner MMG will cease gold operations at its Sepon mine, in Laos, in December, owing to the depletion of ore reserves and lower margins.

Singapore-listed MMG said on Monday that it would place its gold plant on care and maintenance, while the Sepon operation would focus solely on copper production.

“The decision to cease gold operations at Sepon is necessary to preserve the strong contribution of the Sepon business,” said CEO Andrew Michelmore.

“Sepon gold oxide reserves have been depleting for some time now, with previous forecasts that production would cease in 2011. The combination of a higher strip ratio and weaker gold price is driving increased production costs,” he said.

Michelmore pointed out that it was no longer economic for MMG to produce gold at Sepon.

Since the start of operations in December 2002, the Sepon gold operation has produced over 1.2-million ounces of gold. The copper operation, in turn, delivers some 80 000 t/y of copper cathode.

Despite some shared fixed costs between copper and gold production, the C1 cost of producing gold has doubled since last year to $1 880/oz in the first half 2013, while the gold price at the end of the first half was about $1 198/oz.

Michelmore said MMG would have to review the overall structure of the operation to meet future needs of the business. This would result in a change to resourcing requirements, which the company would work through over the coming months.

“MMG acknowledges that this is disappointing news for our workforce. We are committed to working closely with our people, communities, suppliers and the Lao government to make the transition as smooth as possible,” said Michelmore.

Sepon would continue exploration activity for gold oxide and primary gold in Laos and review the recommencement of gold production when value can be created for shareholders.

Edited by Creamer Media Reporter

Comments

Latest News

Sayona completes bookbuild for A$200m raise
Sayona completes bookbuild for A$200m raise
Updated 2 hours 14 minutes ago By: Esmarie Iannucci

Showroom

SMS group
SMS group

At SMS group, we have made it our mission to create a carbon-neutral and sustainable metals industry.

VISIT SHOWROOM 
Sandvik Rock Processing Solutions
Sandvik Rock Processing Solutions

Sandvik Rock Processing Solutions is a leading supplier of equipment, tools, parts, service and solutions for processing rock and minerals in the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine cover image
Magazine round up | 26 May 2023
26th May 2023

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.062 0.093s - 90pq - 2rq
Subscribe Now