McArthur River zinc mine Phase 3 development project, Australia
Name and Location
McArthur River zinc mine (MRM) Phase 3 development project, Northern Territory, Australia.
Client
Xstrata Zinc.
Project Description
The project will more than double capacity at from 2014 Xstrata’s MRM, from 2.5-million tons of ore a year to 5.5-million tons a year, extending the mine’s life to 2038.
The MRM Phase 3 development project will increase zinc production to 360 000 t/y and lead production to 800 000 t/y.
Advanced processing technology on site will, for the first time, enable MRM to produce separate zinc concentrate acceptable to all smelters from its bulk zinc-lead concentrate.
The project will reduce average unit costs by more than 20% and reserves will increase by about 70-million tonnes to 115-million tonnes, making MRM the largest zinc resource in the world.
The project proposes the expansion of the current pit within the existing bund from a footprint of 145 ha to 210 ha and the depth from 210 m to 420 m; an increase in the capacity of the existing tailings storage facility and the lining of the existing Cell 3 and proposed Cell 4 with a high-density polyethylene barrier to prevent potential seepage; the generation of about 530-million tonnes of additional waste rock, to be accommodated in one existing and two new overburden facilities; the construction of a temporary construction camp; and the upgrade of existing infrastructure facilities.
A 20-year supply agreement has been secured with Energy Developments to develop a new gas-fired power station at MRM, generating 40 MW/y to service the expanded operations from 2014.
Value
$369-million has been approved for the development, subject to final approval by the Australian government.
Duration
Following approvals, the Phase 3 development will be commissioned in 2012 and reach full production in 2014.
Latest Developments
The Phase 3 expansion project has entered its final stage, following the completion of the mechanical works in September.
The new equipment is expected to undergo final commissioning by November, with minimum interference to the existing plant, and final completion is expected by February 2014.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Xstrata Zinc Australia GM corporate affairs, community relations and human resources, Joanne Pafumi, tel +61 7 3295 7586 or email jpafumi@xstratazinc.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation