Mariposa iron-ore project, Chile
Name and Location
Mariposa iron-ore project, Chile.
Client
Admiralty Minerals Chile, a subsidiary of Admiralty Resources.
Project Description
The Mariposa project is part of Admiralty’s Harper South project.
A prefeasibility study (PFS) completed on Mariposa has confirmed the project to be economically viable, technically feasible and environmentally sound.
The project hosts measured resources of 27.8-million tonnes, with an average of 35.6% iron in total (FeT), indicated resources of 2.9-million tonnes at 34.4% FeT and inferred resources of 35.9-million tonnes at 31.1% FeT.
The PFS considers a traditional openpit mining operation using drilling, blasting, loading and hauling technology, and will include an on-site processing plant.
Mariposa has an estimated 12-year mine life, with total production estimated at 10.9-million tonnes of final product, at 62% FeT, and 24-million tonnes of waste.
Value
The project cost is estimated at $62.37-million.
Duration
Not stated.
Latest Developments
There is a potential upside to the current PFS in that it may be improved, following the results of further detailed metallurgical testing, which is currently under way.
The design of the process plant could also be refined, resulting in lower feed grades, greater mineral resources available for processing and an expanded mine life.
The feasibility study will focus on final product price, port availability, diesel cost and environmental permits,.
Key Contracts and Suppliers
Not stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Admiralty Resources, tel +61 3 9620 7144, fax +61 3 8677 6949 or email info@ady.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation














