Manica gold project, Mozambique
Name and Location
Manica gold project, Mozambique.
Client
Xtract Resources.
Project Description
The proposed project will include two openpits, a shallow underground mine area to be accessed through adits and a 60 000 t/m processing plant, with supporting infrastructure and residue facilities.
The project is targeting the nonrefractory, relatively shallow ore.
Life-of-mine is currently expected to be less than ten years.
Net Present Value/Internal Rate of Return
Not stated.
Value
$28-million.
Duration
Production is targeted for 2017.
Latest Developments
The gold resource of the Manica project has increased 36% to 1.26-million ounces.
The increase follows an independent technical study of the mineral resources of the project’s Fair Bride gold deposit by Minxcon Projects. The results of the study will form a part of the Manica project’s bankable feasibility study, which is nearing completion.
"Not only has the gold content increased significantly, but the total measured and indicated volume available to be mined has also increased by over 56%,” Xtract CEO Jan Nelson has said.
He notes that this creates flexibility from an openpit perspective, considering the company’s revised mine plan.
“The life-of-mine of the project has the potential to be increased well beyond 12 years with further drilling," he has said.
Key Contracts and Suppliers
JP Mining Consulting (scoping study), EnviroSig and SLR Consulting Africa (environmental-impact assessment) and Read Matomo (preliminary gold plant and infrastructure capital and working-cost estimates).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Auroch Minerals, tel +27 11 218 3856, fax +27 11 880 1270 or email admin@aurochminerals.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation