Malelane iron-ore project, South Africa
Name and Location
Malelane iron-ore project, Mpumalanga, South Africa.
Client
Ferrex.
Project Description
The project is located over part of the Archaean Barberton greenstone belt and covers 4 192 ha.
Three distinct banded iron formation (BIF) horizons have been identified on the property, with a combined strike length of 14 km and mapped horizontal widths of up to 300 m.
The project has a Joint Ore Reserves Committee-compliant inferred resource of 139-million tonnes at 37% iron, which is modelled on only 1.1 km of the 14 km BIF strike, and the project has an upgraded total exploration target of 1.6-billion tonnes to 2-billion tonnes at 28% to 30 % iron, as announced in June 2013.
Envisaged is an initial 1.8-million-tonne operation at 57% iron, with a life-of-mine of 16.6 years and a conventional openpit mine with a strip ratio of 1.55:1.
Value
The project has an estimated capital expenditure of $139-million.
Duration
Ferrex is expecting the project to start production in 2016.
Latest Developments
Environmental, social and labour studies are under way ahead of Ferrex’s mining licence application. The results from these studies could also be included in the company’s ongoing prefeasibility study on the project.
The PFS is expected to released in the 2014.
Key Contracts and Suppliers
Turgis Consulting (scoping study), Prime Resources (environmental plans) and Leyanda (social and labour plan).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Ferrex, tel +44 207 236 1177.
Turgis Consulting, tel +27 11 476 2279, fax +27 11 476 257 or
email info@turgis.co.zainfo@turgis.co.za.
Prime Resources, tel +27 11 447 4888, fax +2711 447 0355 or email prime@resources.co.za.
Leyanda Group, tel +27 11 684 1267, fax+27 11 684 1201 or email info@leyandagroup.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation