Name and Location
Makhado coking coal project, Limpopo, South Africa.

Client
Coal of Africa Limited (CoAL).

Project Description
The Makhado project is CoAL’s anchor project in the Soutpansberg coalfield, in Limpopo, where the company has access to a significant hard coking and thermal coal resource, with the gross tonnes in situ estimated at eight-billion tonnes.

A definitive feasibility has defined a 16-year life-of-mine, with mining expected to take place at an average rate of 12.6-million tonnes a year of run-of-mine to produce 2.3-million tonnes a year of hard coking coal and 3.2-million tonnes a year of thermal coal at a steady state.

The resource will be mined on an opencast basis, with potential underground expansion.

The project has been divided into three mining areas for technical, logistical and practical reasons – East pit, Central pit and West pit.

Mining will be staggered, starting with the East pit, followed by the Central and West pits. The development of the East pit will include plant and infrastructure components, which will cater for the production volumes from the other pits.

The processing plant will comprise:
• a double-stage dense-medium separation plant for the destoning and beneficiation of the hard coking coal and the thermal product, achieved through a high-gravity wash and followed by a low-gravity wash for the coarse-size fraction of –50+1mm;
• a fines (–1+0.15mm) circuit, encompassing a low-gravity reflux classifier process for the production of the coking coal and a high-gravity reflux classifier for the production of the thermal product; and
• an ultrafines (–0.15mm) circuit of Jameson column flotation cells for the production of the coking coal and a potential thermal product.

Value
Capital expenditure is pegged at R3.96-billion, including contingency.

Duration
Not stated.

Latest Developments
The Limpopo Department of Economic Development, Environment and Tourism has granted CoAL environmental authorisation for its R3.96-billion Makhado project, in the Soutpansberg coalfield.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
CoAL, tel +61 8 9316 9100, fax +61 8 9315 5475 or email perth@coal0fafrica.com.
CoAL investor relations, Sakhile Ndolvu, tel + 27 11 575 6858.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.058 0.945s - 111pq - 2rq
Subscribe Now