https://www.miningweekly.com
Africa|Business|Components|Electrical|Energy|Flow|Industrial|Power|PROJECT|Projects|Flow|Drilling
Africa|Business|Components|Electrical|Energy|Flow|Industrial|Power|PROJECT|Projects|Flow|Drilling
africa|business|components|electrical|energy|flow-company|industrial|power|project|projects|flow-industry-term|drilling

Maiden estimate points to larger inferred resource at Rainbow’s Phalaborwa project

17th June 2021

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

Rainbow Rare Earths reports that the maiden Joint Ore Reserves Committee- (Jorc-) compliant mineral resource estimate for its Phalaborwa project has an inferred estimate of 38.3-million tonnes at 0.43% total rare earth oxides, which is larger than the 35-million tonnes initially expected from the gypsum stacks.

The maiden Jorc mineral resource has been estimated based on the assay results received from 1 056.3 m of auger drilling completed in December 2020. 

The project contains neodymium and praseodymium oxide – the essential metals for permanent magnets that are being used in electrical components and represent 29.1% of the total contained rare earth oxides, with an in-situ value of $95/t of gypsum.

Rainbow also notes that the economic dysprosium and terbium oxide credits, with an in-situ value of $28/t of gypsum, enhance the overall value of the rare earth basket contained in the stacks, with the in-situ value of these four high-value rare earth elements totalling $123/t of gypsum.

Also, there are low levels of radioactive elements confirmed in the inferred mineral resource estimate, which Rainbow says confirm the “green credentials” of the project.

CEO George Bennett says the maiden mineral resource estimate for Phalaborwa marks an important milestone for Rainbow, underpinning the opportunity for the rapid development of a low-capital and low-operating cost, high-value processing facility in South Africa to provide the essential metals to power the “green revolution”.

He explains that because the rare earths are present in a chemical, rather than a mineral form in the gypsum stacks, it removes the need, as with the majority of global rare earth projects, to firstly produce a mineral concentrate before undertaking a complex and energy-intensive cracking process.

The initial Phalaborwa process will deliver a cracked rare earth carbonate and studies are ongoing to investigate whether the rare earth metals can be delivered as separated rare earth oxides for direct sale to industrial users.

“This gives us confidence that Phalaborwa will become the cornerstone of Rainbow’s business in the near term,” says Bennett.

Alongside the recently announced metallurgical test work results, which have confirmed that the gypsum stacks are amenable to simple, direct leaching with low-cost sulphuric acid at ambient temperature and pressure, he says the roadmap to commercialising the Phalaborwa deposit is now clear.

“We look forward to announcing further metallurgical test work results ahead of completing an initial scoping study/preliminary economic assessment in [the third quarter of this year],” says Bennett.

As such, further metallurgical test work is ongoing with Ansto Minerals in Australia to define a preliminary processing flow sheet to support a scoping study/preliminary economic assessment for the Phalaborwa project.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

Alco-Safe
Alco-Safe

An unmanned breathalyser that is made to be tough and simple to use. Can be used in any environment for operator-free breathalyser testing.

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hyphen, Eva mine, ferrochrome price make headlines
Hyphen, Eva mine, ferrochrome price make headlines
27th March 2024
Resources Watch
Resources Watch
27th March 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.152 0.19s - 93pq - 2rq
Subscribe Now