Mahenge Liandu graphite project, Tanzania
Name of the Project
Mahenge Liandu graphite project.
Location
Tanzania.
Client
Armadale Capital.
Project Description
The Mahenge Liandu deposit is one of the highest-grade large flake deposits globally after the recent upgrade to 51.1-million tonnes at 9.3% total graphitic carbon (TGC), including 38.7-million tonnes in the indicated category at 9.3% TGC and 12.4-million tonnes in the inferred category at 9.1% TGC.
The scoping study completed on the project is based on a throughput of 400 000 t/y over a 32-year mine life from the start of construction.
The deposit has a low average strip ratio of 1:1 for the life of the mine and a very low operating cost of $408/t.
There remains significant scope to further improved returns, with staged expansions, as the current mine plan is based on about 25% of the total resource
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pre-tax net present value, at a 10% discount rate, of $348.7-million and an internal rate of return of 122%, with a payback of 1.2 years.
Value
The project has a low development capital expenditure of $35-million.
Duration
Not stated.
Latest Developments
The results of the scoping study have confirmed the combination of high graphite feed grade and coarse flake high-purity graphite product, delivering robust project economics and warranting progress to the next phase of feasibility studies to progress the project to a decision to mine in early 2019.
In the interim the company will start negotiations with identified strategic funders and offtake partners.
Key Contracts and Suppliers
BatteryLimit (scoping study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Armadale Capital, tel +44 20 7236 1177 or email info@armadalecapitalplc.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation