Mahenge graphite project, Tanzania

Location map of the Mahenge project

Photo by Black Rock Mining

18th November 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Mahenge graphite project.

Location
Ulanga district of the Morogoro region, in Tanzania.

Project Owner/s
Australian mining company Black Rock Mining.

Project Description
Mahenge will be an openpit mining operation, based on mining the Ulanzi and Cascade deposits.

An independent review of the front-end engineering design (FEED) and an enhanced definitive feasibility study (eDFS) has confirmed the Tier 1-scale Mahenge project as robust, with attractive returns.

The project will use contract mining as proposed in the eDFS instead of owner operator mining.

Mahenge ore will be processed over the life-of-mine (LoM) using a four-stage approach where four process plants will be built sequentially in a modular format.

Processing throughput will initially be one-million tonnes a year when the Module 1 process plant is commissioned, increasing to two-million tonnes a year when Module 2 is commissioned, to three-million tonnes a year when Module 3 is commissioned and to four-million tonnes a year with the completion of Module 4.

The four stages will be developed over the initial years of the mine, with the current mine schedule indicating an LoM of 26 years, after which the current defined deposits will be depleted.

Module 1 and 2 process plants will process ore from the Ulanzi deposit, while Module 3 and 4 process plants will process ore from the Cascade and Epanko deposits.

The Module 1 process plant will be fed run-of-mine ore at an average grade of 8.24% total graphitic carbon and will recover an estimated 93% of this graphite to produce about 87 000 t/y of graphite products over the first 20 full years of production.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 10% nominal rate, of $1.38-billion and an internal rate of return 36%, with a payback of 3.8 years.

Capital Expenditure
Based on the FEED work, the updated capital cost estimate for the development of Module 1 is $182-million, including a contingency allowance of $22-million. Module 2 is estimated $107-million. The updated capital expenditure for modules 3 and 4 is estimated at $117-million and $104-million respectively.

Planned Start/End Date
The project has a 20-month construction period.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Black Rock Mining, tel +61 8 9320 7550 or email info@blackrockmining.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

SBS Tanks
SBS Tanks

SBS® Tanks is a leading provider of innovative water security solutions with offices in Southern Africa, East and West Africa, the USA and an...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 10 May 2024
Magazine round up | 17 May 2024
17th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.161 0.219s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: