Lower output, high costs to pressure Newmont, Barrick earnings
North American gold miners Newmont and Barrick Gold are expected to post lower quarterly profits as a fall in production and higher costs offset gains from strong prices of the precious metal.
Miners grappled with extreme weather, including heavy rainfalls in certain parts of the world, lower grade sequencing, labor shortages and supply chain constraints.
The challenges have overshadowed the price rise in the safe-haven asset that peaked over the $2 000-mark during the quarter ended March 31 on fears over the stability of the financial system after a banking crisis and a potential recession.
"Despite rising 1Q gold prices, cost pressures and low volumes represent an overhang into financial results," said analysts at RBC Capital Markets.
All-in sustaining costs (AISC), an industry metric that reflects total expenses, are set to rise for the miners.
"Despite a deceleration of input cost pressures, 2H22 inflation plus low 1Q volumes point to high costs this quarter," RBC added.
Barrick expects first-quarter gold production to fall 15% sequentially, as a severe winter hampered the Canadian miner's operations in northern Nevada and annual maintenance activity weighed on output at its Goldstrike mine.
Top gold miner Newmont, which is pursuing Australia's Newcrest Mining for A$29.4-billion ($19.84-billion), is also expected to post lower production.
"We expect (Newmont's) 1Q to be a lower production quarter, partly due to mine sequencing as well as low production at Tanami (Australia) due to weather related issues. We also anticipate costs to remain elevated," Raymond James analyst Brian MacArthur said.
Analysts expect Newmont's attributable gold production to come in at 1.265-million ounces, lower than 1.34-million ounces the company reported a year earlier.
Newmont is expected to report quarterly results on April 27, and Barrick on May 3.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation