https://www.miningweekly.com

Los Pelambres copper mine expansion, Chile

23rd March 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project

Los Pelambres copper mine expansion.

Location

The project is located in Chile’s Coquimbo region, 240 km north-east of Santiago.

Client

Antofagasta.

Project Description

Los Pelambres has resources of 1.3-billion tonnes at 0.61% copper, 0.019% molybdenum and 0.05 g/t gold.

The project entails the incremental expansion of the Los Pelambres mine.

The expansion project has been split into two phases to facilitate its progress, simplify permitting applications and spread the cost over a longer period.

Phase 1 is designed to optimise throughput within the limits of the existing operating, environ-mental and water extraction permits so that only relatively simple updates will be required.

During this phase, Los Pelambres will operate at an average throughput of 190 000 t/d, following  the addition of a new grinding and flotation circuit to mitigate the hard ore currently being mined, and a 400 ℓ/s desalination plant and pipeline. 

Desalinated water will be pumped to the tailings storage facility (TSF) at El Mauro, where it will flow into the recycling circuit returning water to the Los Pelambres plant.

The expansion is estimated to increase copper production by an average of 55 000 t/y over 15 years.

In Phase 2, Antofagasta aims to increase throughput to 205 000 t/d and to extend the mine’s life beyond the currently approved 21 years. 

As part of this development, a new environmental-impact assessment must be submitted to increase the capacity of the mine’s El Mauro TSF and the mine waste dumps.

Potential Job Creation

Not stated.

Net Present Value/Internal Rate of Return

Not stated.

Value

Phase 1 is estimated at $1.05-billion (feasibility study figures).

Phase 2 is estimated at $500-million (prefeasibility study figures).

Duration

Start-up is expected in 2021.

Latest Developments

The project is expected to be presented to the board for approval this year, once the environmental-impact assessment has been approved.

Key Contracts and Suppliers

None stated.

On Budget and on Time?

Not stated.

Contact Details for Project Information

Antofagasta, tel +44 20 7808 0988, fax +44 20 7930 7578 or email info@antofagasta.co.uk.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
ECG Engineering
ECG Engineering

ECG provides specialised electrical engineering services to the Mining, Utilities, Materials Handling and Industrial industries, with extensive and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.045 0.961s - 111pq - 2rq
Subscribe Now