https://www.miningweekly.com
Construction|Financial|Mining|PROJECT|rail
Construction|Financial|Mining|PROJECT|rail
construction|financial|mining|project|rail

Longonjo neodymium/praseodymium project, Angolo – update

Image of rare earths

15th December 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Longonjo neodymium/praseodymium project.

Location
Huambo, Angola – 4 km from a modern rail line leading directly into the Atlantic Ocean Port of Lobito.

Project Owner/s
Pensana Rare Earths holds an 84% interest in Longonjo through its 84% holding in Angola-registered company Ozango Minerais, which, in turn, owns 100% of the mining licence.

The Angolan government holds a 10% interest and the company’s Angolan partners hold the remaining 6%.

Project Description
Longonjo is one of the biggest rare earths deposits in the world, with an initial 20-year mine life.

The project has total proven and probable reserves of 30.1-million tonnes grading 0.55% neodymium/praseodymium oxide for 166 000 t neodymium/praseodymium and total rare-earth oxides (TREOs) of 767 000 t.

The mine execution plan is based on a staged development of the mine and processing facilities.

At full production, once the phased development is complete, the Longonjo mine will target production of up to 38 000 t/y of mixed rare-earth double sulphate or mixed rare-earth carbonate (MREC), containing 14 000 t of TREOs and up to 4 400 t of neodymium/praseodymium oxides, equating to about 5% of the worldwide production of neodymium/praseodymium oxides a year for downstream processing or to be sold on the international market.

Initial feedstock will be shipped as a clean, high-purity mixed rare earth sulphate to Pensana’s Saltend rare-earth oxide separation facility, in the UK.

Potential Job Creation
The mine will employ about 650 people during construction and will create 420 permanent high-value jobs.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Initial capital costs are estimated at $200-million.

Planned Start/End Date
The project can be put into production in less than 18 months.

Latest Developments
An announcement is expected to be made in the first quarter of 2024 regarding the financing of the upfront capital expenditure needed to develop the Longonjo project.

Financing is being worked on by sovereign wealth fund Fundo Soberano de Angola and financial institution Absa, along with other African multilateral agencies.
The upfront capital cost of $200-million, with about $105-million deferred until Year 3, pertains mainly to plant expansion, grid connection and a rail spur.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Pensana Rare Earths, email admin@pensana.co.uk orir@pensana.co.uk.

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

 

Showroom

GreaseMax
GreaseMax

GreaseMax is a chemically operated automatic lubricator.

VISIT SHOWROOM 
Hanna Instruments Image
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024
Resources Watch
Resources Watch
2nd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.124 0.189s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: