Longonjo neodymium/praseodymium project, Angola – update

Image of Angola map/flag

1st March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Longonjo neodymium/praseodymium project.

Location
Huambo, Angola – 4 km from a modern rail line leading directly into the Port of Lobito in the Atlantic Ocean.

Project Owner/s
Pensana Rare Earths holds an 84% interest in Longonjo through its 84% holding in Angola-registered company Ozango Minerais, which, in turn, owns 100% of the mining licence.

The Angolan government holds a 10% interest and the company’s Angolan partners the remaining 6%.

Project Description
Longonjo is one of the biggest rare earths deposits in the world, with an initial 20-year mine life.

The project has total proven and probable reserves of 30.1-million tonnes grading 0.55% neodymium/praseodymium oxide for 166 000 t neodymium/praseodymium and total rare-earth oxides (TREOs) of 767 000 t.

The mine execution plan is based on a staged development of the mine and processing facilities.

At full production, once the phased development is complete, the Longonjo mine will target production of up to 38 000 t/y of mixed rare-earth double sulphate or mixed rare-earth carbonate (MREC) containing 14 000 t of TREOs and up to 4 400 t of neodymium/praseodymium oxides. This equates to about 5% of the worldwide production of neodymium/praseodymium oxides a year for downstream processing or to be sold on the international market.

Initial feedstock will be shipped as a clean, high-purity mixed rare earth sulphate to Pensana’s Saltend rare earth oxide separation facility, in the UK.

Potential Job Creation
The mine will employ about 650 people during construction and will create 420 permanent, high-value jobs.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Initial capital costs are estimated at $217-million, including contingency.

Planned Start/End Date
Longonjo is expected to produce 20 000 t of MREC starting in 2026 and 40 000 t of MREC from 2029 onwards following the planned expansion.

Latest Developments
Pensana has concluded a nonbinding term sheet with the Longonjo lender consortium for a project finance debt facility of up to $156-million.

The facility is aimed at providing limited recourse senior secured project finance to fund the Longonjo mine, flotation circuit and refinery.

The maximum tenor of the facility is to cover the construction period and ramp-up to full production, plus four years to an overall maximum of seven years. The facility is conditional on obtaining guarantees from the relevant export credit agency, for which discussions are well advanced.

The company is in advanced discussions with the Angola Sovereign Wealth Fund, or FSDEA, and a member of the lender consortium to finalise the $80-million equity component of the overall financing package.

Meanwhile, Pensana is in advanced discussions with several parties for the offtake of the “highly marketable”, radionuclide-free MREC and has recently received product approval from one of its potential customers.

The company expects to be in a position to sign up to 100% of the production of the high value, clean MREC from the Longonjo processing facility.


Key Contracts, Suppliers and Consultants
ADP (main contractor); and MCC (main construction).

Contact Details for Project Information
Pensana Rare Earths, email admin@pensana.co.uk orir@pensana.co.uk.

Edited by Creamer Media Reporter

Comments

Latest News

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Universal Storage Systems (SA)
Universal Storage Systems (SA)

South African leader in Steel -Racking, -Shelving, and -Mezzanine flooring. Universal has innovated an approach which encompasses conceptualising,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024
Magazine cover image
Magazine round up | 26 April 2024
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.677 0.737s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: