Livengood gold project, US
Name and Location
Livengood gold project, Alaska, US.
Client
International Tower Hills Mines (ITH).
Project Description
The project has been designed as a conventional, owner-operated surface mine that will use large-scale mining equipment in a blast/load/haul operation. Ore is planned to be processed in a 100 000 t/d comminution circuit, consisting of a primary gyratory crusher, wet grinding in a single semiautogenous mill and two ball mills, a gravity gold circuit and a conventional carbon-in-leach circuit.
The project will include a lined tailings management facility, two water reservoirs, an administration office/shop/warehouse complex and a 440-person camp, as well as the construction of a 80.4 km transmission line to the site from the existing grid power near Fairbanks, Alaska.
Value
Initial capital costs for the project are estimated at $2.79-billion.
Duration
A timeframe has not been disclosed.
Latest Developments
A feasibility study (FS) on ITH’s Livengood project has determined that the project is not economically robust in the current gold market.
“While the large project FS results are not economically robust in today’s gold market, the Livengood project remains a very significant gold deposit in one of the most favourable jurisdictions in the world. The company is highly focused on advancing lower-cost opportunities identified in the FS,” say ITH CEO Don Ewigleben.
The company believes that the mill throughput and production schedule optimisation studies may provide opportunities to reduce project capital costs. A lower mill throughput may offer an opportunity to enhance mill head grades in the early years using a more aggressive stockpile management strategy than is assumed in the FS.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
ITH investor relations manager Michelle Stachnik, tel +1 720 881 7646 ext 203 or email mstachnik@ithmines.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation