Lift II copper project, South Africa

5th September 2014

  

Font size: - +

Name and Location
Lift II copper project, Limpopo, South Africa.

Client
Palabora Mining Company (PMC).

Project Description
Palabora Copper has been producing copper in South Africa for more than 50 years, initially as a large opencast operation and thereafter as an underground block cave operation in 2002, known as Lift I.

The current underground block cave operation was developed with a plan to deplete the Lift I reserve by 2020. The closure of Lift I has been brought forward by five years to December 2015, owing to dilution from the North wall failure.

A comprehensive geological, mine and financial study has demonstrated that copper production at Palabora Copper can be extended on an economically rational basis beyond this date with the construction of a second lift underground block cave operation, known as Lift II.

A new Lift II mining footprint 450 m below Lift I  will ensure a continuation of copper mining until 2033.

Value
The project is estimated at R9.3-billion .

Duration
Not stated.

Latest Developments
The project is awaiting shareholder approval.

A bankable feasibility study on the planned Lift II project has been undertaken, which Palabora Copper growth division GM Nick Fouche says has provided a sound technical and positive business case to proceed to full execution.

About R2-billion has been spent to date on the development of a twin decline and supporting engineering infrastructure as part of an early works programme.

This has ensured critical access to the undercut and will enable the Lift II production level to be ready for construction.

After recommending to shareholders, in May, that the project go to full execution, Fouche said new shareholders had wanted more information to make an informed decision and select the appropriate funding model.

“While the board did not provide a full approval for the entire project, certain works were allowed to continue, pending the final shareholders’ decision, scheduled for end of September,” he advised.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Palabora Mining Company GM corporate affairs and company secretary Keith Mathole, tel +27 15 780 2182, fax +27 15 780 2061, fax-to-email +27 86 724 4698 or email keith.mathole@palabora.co.za .

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.054 0.9s - 111pq - 2rq
Subscribe Now