Letlhakane uranium project, Botswana
Name and Location
Letlhakane uranium project, Botswana.
Project Description
The proposed project involves the construction of Botswana's first uranium mine at Letlhakane.
A scoping study conducted on the Letlhakane site has confirmed a resource of 280-million tons, at 158 parts per million uranium oxide (U3O8) for 44 500 t of contained concentrate.
The study concluded that the shallow-lying ore will be extracted by conventional openpit mining equipment under a typical mining contract, where the contractor assumes responsibility for all earth works to the point at which run-of-mine production is delivered to the crushers.
The crushed ore will be stacked on a purpose-designed leach pad. Alkaline heap leaching, solvent extraction and ion exchange will then recover the U3O8.
Site power will be sourced through a new 10-km power line connecting to the Botswana state grid at the switch station in Serule.
The water will be sourced from a borefield developed into aquifers within the exploration tenement. This has yet to be verified.
Value
The proposed project will cost an estimated $169-million.
Duration
The company plans to apply for a mining licence from the government of Botswana in early 2010.
The plan is to bring the mine into production by 2011.
Client
A-Cap Resources.
Key Contracts and Suppliers
None stated.
Latest Developments
Tenders will soon be called to start the feasibility study into the proposed mine.
On Budget and on Time?
Not stated.
Contact Details for Project Information
A-Cap Resources, tel +61 3 9813 5888 or fax +61 3 9813 2668.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation