Öksüt gold project, Turkey
Name of the Project
Öksüt gold project.
Location
Turkey.
Project Owner/s
Öksüt Madencilik Sanayi vi Ticaret, a subsidiary of Centerra Gold.
Project Description
The Öksüt project’s estimated mineral reserves as at June 30, 2015, were 26.1-million tonnes at an average grade of 1.4 g/t of gold containing 1.2-million ounces of gold using a cutoff grade of 0.3 g/t and a gold price of $1 250/oz.
The feasibility study envisions a conventional openpit and heap-leach operation. The heap-leach pad has been designed with an ultimate ore capacity of 40-million tonnes.
Electrical power is expected to be supplied to the project using a dedicated 28 km power line connected to the local power grid.
Water supply is expected to be sourced from two company-owned water wells, which have been fully permitted.
It is envisoned that a local contractor will conduct mining using a conventional truck-and-shovel fleet comprising small, selective loading equipment and 36 t trucks.
The life-of-mine (LoM) strip ratio is expected to be 2:1.
The ore will be crushed to 38 mm through two stages of crushing and placed on the heap-leach pad at 11 000 t/d.
LoM gold recovery is expected to be 77%.
The project is expected to process 26.1-million tonnes of ore at an average grade of 1.4 g/t gold over eight years, producing 895 000 oz of gold at an average all-in-sustaining cost of $490/oz sold.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a base case net present value, at an 8% discount rate, of about $242-million and an internal rate of return of 42.5%.
Capital Expenditure
Preproduction and construction capital is expected to be a modest $221-million, which includes a $25-million contingency.
Planned Start/End Date
Centerra expects to pour first gold from the mine in the first quarter of 2020.
Latest Developments
The Öksüt project is progressing into operation and will soon be Canadian miner Centerra Gold’s third source of gold production, company president and CEO Scott Perry has said.
The project has started crushing stockpiled ore and stacking crushed ore on the heap-leach pad, following the receipt of normal course approvals from the Turkish Ministry of Environment and Urbanisation.
The first gold pour from Öksüt is expected in early January.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Centerra Gold VP investor relations John Pearson, tel +1 416 204 1953 or email john.pearson@centerragold.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation