https://www.miningweekly.com

Koka gold project, Eritrea

11th December 2009

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Koka gold project, Eritrea

Project Description
A scoping study on the Koka deposit, at the Zara project, has shown that the deposit has the potential to underpin a highly lucrative gold-mining operation.

Koka is forecast to produce an average of 110 000 oz/y of gold at a cash cost of
$424/oz over a six-year mine life.

There is also the potential to increase project economics by further optimising pit design based on planned geotechnical drilling.

Value
The scoping estimates capital costs of $97,8-million.

Duration
The overall project implementation schedule estimates a total duration of 16 months from approval to commissioning.

Client
The project is 80%-owned by Chalice Gold Mines and 20%-owned by Dragon Mining, while the Eritrean government is entitled to a 10% free carried interest. In addition, the Eritrean government has the right to buy up to a further 30% in the project on financial terms to be agreed, payable to the joint venture in consideration of diluting their respective interests.

Key Contracts and Suppliers
None stated.

Latest Developments
Chalice Gold is proceeding with a full feasibility study on the project, which is expected to be completed by mid-2010.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Chalice Gold Mines, tel +618 9322 3960, fax +618 9322 5800 or email info@chalicegold.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 
ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.04 0.869s - 111pq - 2rq
Subscribe Now