Koitelainen vanadium project, Finland
Name of the Project
Koitelainen vanadium project.
Location
Central Finland.
Project Owner/s
Pursuit Minerals.
Project Description
Encouraging results have been received from a scoping study on the Koitelainen vanadium project.
The scoping study has been based on the inferred mineral resource declared for the Koitelainen project in February 2019. The resource totals 116.4-million tonnes, at and in situ grade of 0.3% vanadium pentoxide.
Mining will be based on bulk mining techniques using standard drill-and-blast, load, haul and crusher feed, followed by magnetic separation to produce a vanadium magnetite concentrate. Lower-grade material will be stockpiled.
Waste material will be stockpiled adjacent to the planned openpits and tailings will be contained within a tailing’s management facility.
Pursuit is unable to report production targets at this time.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Pursuit is unable to report net present values at this time.
Capital Expenditure
Not stated.
Planned Start/End Date
Not stated.
Latest Developments
The Koitelainen scoping study will be updated following further metallurgical testwork to determine optimal processing parameters and maximise recovery rates. Further increases to mass recoveries and overall vanadium recovery may have additional positive effects on the Koitelainen project economics.
The data will be delivered in the first quarter of 2020 and the Koitelainen scoping study will be updated soon thereafter.
In addition, an updated mineral resource for the Koitelainen Vosa prospect will be completed in the first quarter of 2020, following completion of the first drilling programme conducted by Pursuit on the project.
Key Contracts and Suppliers
SRK (scoping study) and ALS Metallurgy (metallurgical tests).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Pursuit Minerals, tel +61 7 3708 1013 or email info@pursuitminerals.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















