Kinsevere project, Democratic Republic of Congo
Name of the project and location
Kinsevere project, Katanga province, Democratic Republic of Congo.
Project description
Anvil Mining has announced that its board of directors has approved the stage 1 development of the Kinsevere copper/cobalt deposits, following the completion of a feasibility study in early May 2006.
The project comprises the Kinsevere Hill, Tshifufia and Tshifufiamashi deposits. The stage I development comprises the construction of a crushing plant (which has been designed to meet the needs of future expansion), a one-million-ton-a-year heavy-media separation (HMS) plant and an electric arc furnace (EAF), with a capacity to produce around 23 000 t/y to 25 000 t/y of ‘black copper’ ingots, grading 85% to 95% of copper.
Stage I will include an upgrade of the existing 25-km access road to the project, the construction of a 27-km power line from the 220 kVA national hydroelectric grid system (with additional built-in capacity for subsequent solvent-extraction and electrowinning (SX-EW) upgrading and expansion) and ancillary buildings on site.
Value
$35-million has been approved for the stage I development.
Duration
It is expected that stage I will be completed at the end of the first quarter of 2007.
Breakdown of main contracts
Not stated.
Client
The joint-venture company, AMCK, in which Anvil Mining owns a 70% interest, and the Mining Company of Katanga which owns 30%.
Latest developments
It is anticipated that AMCK will upgrade and expand the HMS-EAF processing facilities within two to three years with an SX-EW plant that will be capable of producing 30 000 t/y of LME grade ‘A’ copper cathode.
A feasibility study on the stage II SX-EW upgrade has started and is expected to be completed during the fourth quarter of 2006. A significant portion of the infrastructure required for the stage II SX-EW development will be completed during the stage I construction.
Participants
Not stated.
Construction materials
Not stated.
On budget and on time?
Not stated.
Contact details for project information
Anvil Mining, tel +61 86263 2214 or fax +61 89481 4800.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation













