https://www.miningweekly.com

Kinross Gold books another multibillion-dollar charge, halts dividends

1st August 2013

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Canadian gold miner Kinross Gold on Wednesday reported a second-quarter loss of $2.48-billion after it booked another multibillion-dollar noncash charge in as many quarters and suspended its twice-yearly dividend.

The company released its financial results for the three months ended June 30 after markets closed on Wednesday, saying the net loss included an after-tax noncash impairment charge of $2.29-billion, which was mainly the result of lower short-term and long-term gold price assumptions.

Kinross also booked a $720-million charge related to its discontinued Fruta del Norte project, in Ecuador.

Adjusted to remove special items, Kinross reported net earnings of $119.5-million, or $0.10 a share, down 24% year-on-year on the $156.8-million, or $0.14 a share, reported in the same period a year earlier, beating average analyst expectations of adjusted earnings of $0.07 a share.

Kinross in February booked a $3.2-billion charge related to the Tasiast mine, in Mauritania, and the Chirano gold mine, in Ghana, both of which were acquired in the company's $7.1-billion takeover of Red Back Mining in 2010. It previously wrote down $2.94-billion in goodwill related to the two mines.

Gold prices have fallen sharply from the start of the year, hitting a near three-year low at about $1 180/oz in late June.

Quarterly revenue fell to $968-million from $1.01-billion.

The total gold-equivalent output increased marginally to 661 636 oz. The Toronto-based miner also said it would defer a decision to expand its Tasiast mill until 2015 at the earliest, regardless of the outcome of a feasibility study on the plant, which is expected in the first quarter of 2014.

In response to the recent drop in the gold price, the company said it would implement cost-cutting measures of about $180-million for the rest of the year and would target significant capital spending savings in 2014. The company reduced its 2013 capital expenditure forecast to about $1.45-billion from $1.6-billion.

To help ensure Kinross maintained a strong balance sheet and liquidity position in the current uncertain gold price environment, the board had determined to suspend the twice-yearly dividend, saying future decisions on the dividend would be based on factors such as market conditions, balance sheet strength and liquidity, operational performance, and the impact of cost reduction measures.

In March, the miner declared a dividend of $0.08 a share.

Kinross maintained its 2013 production guidance of between 2.4-million and 2.6-million attributable gold-equivalent ounces at a cost of $740/oz to $790/oz and all-in sustaining costs of between $1 100/oz and $1 200/oz sold.

The company’s NYSE-listed stock, which had fallen 46.65% since the start of the year, on Wednesday closed at $5.23 apiece.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.051 1.039s - 111pq - 2rq
Subscribe Now