https://www.miningweekly.com
Construction|Export|Financial|Gold|Mining|PROJECT|Projects|Technology
Construction|Export|Financial|Gold|Mining|PROJECT|Projects|Technology
construction|export|financial|gold|mining|project|projects|technology

Kinross evaluating Chile comeback, options for Mauritania expansion

9th May 2019

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Canada-based Kinross Gold is evaluating the potential for a return to long-term production in Chile and has completed the scoping study for the Lobo-Marte project, in the Maricunga district, about 80 km from its La Coipa mine.

The scoping study results indicate that Lobo-Marte could produce about 4.1-million ounces of gold, at 1.2 g/t, over a ten-year mine life, Kinross said this week.

The initial estimate for capital is $750-million, with a three-year construction timeline after project approval.

The study contemplates a heap leach and sulphidisation, acidification, recycling and thickening (SART) plant operation. Kinross has previously leveraged SART technology in the region.

Kinross said it would advance Lobo-Marte to a prefeasibility study (PFS), which would be completed by the middle of next year.

The company is also continuing work on the restart feasibility study for the La Coipa project, which would be completed in the third quarter. Mining of the existing orebody at La Coipa was suspended in late 2013.

Production at Lobo-Marte will start at the end of the La Coipa mine life.

Besides the Chile projects, Kinross’ development pipeline also includes the Round Mountain Phase W and Bald Mountain Vantage Complex projects, in Nevada, which are entering their commissioning phases. The Gilmore expansion at Fort Knox, in Alaska, is also under way, with stripping to start in the third quarter and initial ore expected in early 2020.

Kinross is also evaluating alternatives for increasing throughput at Tasiast, in Mauritania.

The alternative options for Tasiast include an initial incremental step to increase throughput to above 20 000 t/d at a significantly lower capital cost through debottlenecking, continuous improvement and further optimisation of the current processing circuit.

Since the Phase 1 expansion at Tasiast, which boosted capacity from 8 000 t/d to 12 000 t/d, the mine has outperformed with throughput averaging about 15 000 t/d in the first quarter of 2019.

The company added that it was advancing project financing for Tasiast, as due diligence activities and discussions regarding commercial terms continued to progress. Kinross is seeking to obtain $300-million in financing from Export Development Canada, the International Financial Corporation, and two commercial banks, and is targeting completion of the financing in the second half of 2019.

PRODUCTION RESULTS

Meanwhile, Kinross reported lower production of 606 031 attributable gold-equivalent ounces (GEO) in the first quarter of 2019, compared with 653 937 GEO in the same quarter a year earlier.

Cost of sales increased slightly to $682/GEO, from $658/oz in the first quarter of 2018, and all-in sustaining costs increased to $925/GEO, from $846/GEO.

The miner realised revenue of $786.2-million in the March 2019 quarter, compared with $897.2-million, as fewer GEOs were sold and prices were lower.

Adjusted net earnings were $83.3-million, or $0.07 a share, compared with $125.2 million, or $0.10 a share, a year earlier.

Net earnings dropped sharply to 64.7-million, or $0.05 a share, for the March quarter,  from $106.1-million, or $0.09 a share, in the comparative period. The decrease was mainly attributed to lower operating earnings, partially offset by a decrease in income tax expense.

Edited by Creamer Media Reporter

Comments

Showroom

Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024
Resources Watch
Resources Watch
17th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.064 0.099s - 91pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: