https://www.miningweekly.com
Aluminium|Botswana|Exploration|PROJECT|Drilling|Infrastructure
Aluminium|Botswana|Exploration|PROJECT|Drilling|Infrastructure
aluminium|botswana|exploration|project|drilling|infrastructure

K.Hill metallurgical results point to high purity manganese

17th June 2021

By: Donna Slater

Features Deputy Editor and Chief Photographer

     

Font size: - +

TSX-V-listed Giyani Metals reports that the preliminary results from metallurgical test work, undertaken by Mintek, carried out at its Botswana-based K.Hill manganese project shows a high-purity manganese sulphate monohydrate (HPMSM) with less than 1% total impurity and manganese content of more than 31.5%.

These preliminary results were achieved by the evaporative crystallisation of a purified solution, with the completed activities – including leach enhancement, bulk leach, base metal precipitation, iron and aluminium precipitation – representing a number of the initial steps of the process flowsheet to produce HPMSM from the K.Hill project ore.

The completed test work also reveals 94% manganese extraction after reductive acid leach; while iron and aluminium removal after neutralisation and precipitation, are 100% and 99.5%, respectively.

In addition, secondary purification kinetic tests show nickel, cobalt and zinc can be removed to detection limits, and sulphuric acid consumption reduced to 90 kg/t of ore compared with earlier estimates of 333 kg/t.

Giyani is also undertaking ongoing field programmes, including exploration drilling programmes at an extension of the existing K.Hill project orebody and the Otse manganese prospect.

The remainder of the metallurgical test programme will focus on further impurity reductions, with the programme set to form part of the feasibility study into the K.Hill project.

The K.Hill project feasibility study reserve infill drilling is complete and assay results and an ore reserve estimate are both expected during the third quarter of this year.

Giyani reports that the related in-pit and civil geotechnical drilling, along with sterilisation drilling in the designated plant and infrastructure areas, is also progressing as planned.

Meanwhile, at the K.Hill extension project, the miner states, 13 of the planned 32 reverse circulation drill holes have been completed to date, representing 923.5 m.

At Otse, two orientation geophysical studies, using ground penetrating radar, have been completed and an induced polarisation programme will commence later this month.

CEO Robin Birchall says the completion of the reserve drilling campaign and the progress on the mineral reserve estimation will culminate in the announcement of Giyani’s maiden reserve in the third quarter.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Latest Multimedia

Latest News

Anglo American chairperson Stuart Chambers
Anglo snubs BHP’s ‘highly unattractive’ proposal
Updated 6 hours ago By: Mariaan Webb

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.125 0.162s - 108pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: