K.Hill manganese project, Botswana
Name of the Project
K.Hill manganese project.
Location
The Kanye Basin, in south-eastern Botswana.
Project Owner/s
Giyani Metals Corp.
Project Description
A preliminary economic assessment (PEA) has demonstrated the strong potential of the project. The PEA is based on an estimated mineral resource, at a cutoff grade of 18% manganese oxide, of 1.1-million tonnes grading 31.2% manganese oxide, 8.9% aluminium oxide, 26.3% silicon dioxide and 16.9% iron (III) oxide.
The project envisages an operation with a nine-year life-of-mine, producing 245 000 t of high-purity electrolytic manganese metal.
The PEA proposes traditional truck-and-shovel mining methods. The proposed process for the production of electrolytic manganese metal includes comminution, leaching, solid/liquid separation and solvent-extraction, as well as electrowinning and refining.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of C$491-million and an after-tax internal rate of return of 90.6%, with a payback of 1.5 years.
Capital Expenditure
Preproduction capital expenditure is estimated at $369-million.
Planned Start/End Date
The project aims to break ground in July 2020.
Latest Developments
Giyani plans to continue hydrometallurgical testing, with electrorefining to produce high-purity electrolytic manganese metal samples for testing by battery makers.
It will also progress with a definitive feasibility study to upgrade K.Hill into a mineral reserve.
Key Contracts and Suppliers
SRK Consulting (PEA).
On Budget and on Time?
Too early to state.
Contact Details for Project Information
Giyani Metals Corp, tel +1289291 4032 or email info@giyanimetals.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















