Kharmagtai copper/gold project, Mongolia
Name of the Project
Kharmagtai copper/gold project.
Location
Mongolia.
Project Owner/s
Xanadu Mines.
Project Description
A scoping study has indicated the project’s potential to develop a low-strip-ratio openpit mining operation in an accelerated time frame, with rapid payback of the life-of-mine infrastructure for future openpit and underground mining operations.
The project is based on indicated and inferred mineral resources, comprising:
- 129.3-million tonnes in the indicated category grading 0.54% copper equivalent,
- 0.36% copper and 0.36 g/t gold; and
- inferred resources of 468.9-million tonnes grading 468.9-million tonnes grading 0.41 copper equivalent, 0.31% copper and 0.19 g/t gold.
The study has focused on mining sulphide mineralisation from three adjacent openpits – Stockwork Hill, Copper Hill and White Hill. Mining is based on bulk openpit mining techniques using standard drill-and-blast, load, haul, crusher feed by an owner operator mining fleet. Metal recovery is estimated at about 86.6% copper and 70.9% gold.
The project includes the construction of a 20-million-tonne-a-year processing facility to process the mineralisation using a standard crushing/milling/flotation process plant, which will result in the production of a filtered copper/gold concentrate.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Initial capital expenditure is estimated $484-million.
Planned Start/End Date
Not stated.
Latest Developments
The scoping study has identified several opportunities for further upside that will improve project economics by extending the life of the openpit mine and targeting the high-grade Stockwork Hill and Copper Hill underground resources.
Xanadu plans to complete an updated mineral resource estimate and conduct infill drilling below the current resource to target the high-grade mineralisation at Stockwork Hill, while also completing conceptual mining studies to investigate the underground potential areas outside of the opencut mines.
Key Contracts and Suppliers
CSA Global (scoping study) and O2 Mining (scoping study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Xanadu Mines, tel +61 2 9547 4300 or email info@xanadumines.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















