Kestanelik gold project, Turkey
Name and Location
Kestanelik gold project, Turkey.
Client
Chesser Resources.
Project Description
A scoping study completed on the Kestanelik project, in north-west Turkey, has concluded that the project will generate strong financial returns.
The project has a Joint Ore Reserves Committee-compliant resource of 5.929-million tons, with an average grade of 2.42 g/t gold and 1.84 g/t silver.
The scoping study contemplates the development of two openpits – one in the north-west of the project tenements to access veins in the Karazone area and a second larger pit in the central K-zone area.
Mining is suited to conventional drill, blast and haul methods.
An estimated 40% of the resource identified to date is situated within 20 m of the surface, with an average grade of about 3 g/t gold, enabling immediate access to high-grade ore.
The scoping study estimates the processing of 850 000 t/y of ore at an average grade of about 2.5 g/t gold and 1.9 g/t silver, producing an average of 67 000 oz/y of gold in the first four years of production.
Life-of-mine production averages 63 000 oz/y of gold and 38 000 oz/y of silver.
Value
$88-million.
Duration
Following the receipt of the necessary permits to begin mining, construction is expected to start in early 2015, with production expected in early 2016.
Latest Developments
A full prefeasibility is expected to start in the June 2013 quarter.
Key Contracts and Suppliers
Dama Engineering (scoping study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Chesser Resources, tel +61 7 3844 0613, fax +61 7 3844 0154 or
email info@chesserresources.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















