https://www.miningweekly.com

Kenya to tender for first double decker road

13th September 2013

By: Creamer Media Reporter

  

Font size: - +

Kenya's Capital  (0.04 MB)

Traffic gridlocks in Kenya’s capital Nairobi are expected to reduce significantly with the planned construction of the first double decker road.

The KenyaNational Highways Authority Director General Meshack Kidenda said the government will soon float tenders seeking for a contractor for the $286-million project.

The elevated highway that will run above the existing Mombasa Road-Uhuru Highway and Waiyaki Way covering a distance of 4 kms is part of the National Urban Improvement Project that contains several components and which is aimed to address the transport crisis in East Africa’s busiest capital.

“We have finalized the design of the road that is expected to ease traffic congestion and soon we will tender for a contractor,” he said.He added construction of the road, which is being financed by the World Bank and theKenya government, is anticipated to commence in January next year and finished in 2017. The government will contribute $113 million in the project.

The double decker road that is expected to end what has become a nightmare section for motorists in Nairobi owing to congestion will run from Nyayo National Stadium — connecting Mombasa Road to Westlands roundabout.

Other components in the project include providing additional lanes, dual-ling of an existing road, construction of new access roads and rehabilitation of existing roads to help ease congestion and facilitating faster movement of traffic from the suburbs to the city.
Nairobi is one of the most populated cities in the world with a population of 4-million in an area of 696 square km. The government estimates the city’s population to be 6,5-million by 2030.

The National Urban Improvement Project forms part of the $4,4-billion transport master plan to get Nairobi out of the current chaos and connect it with the satellite towns using a state-of-the-art mass transport system.

The plan that is being executed under the Vision 2030 development blueprint involves construction of a 167 km public roads and rail transport linking Nairobi with neighbouring towns, something that should help decongest the city.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 
Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.052 0.542s - 111pq - 2rq
Subscribe Now