https://www.miningweekly.com

Kayelekera uranium project, Malawi – update

Image of uranium in hand

17th September 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kayelekera uranium project.

Location
Karonga district, in northern Malawi.

Project Owner/s
Lotus Resources.

Project Description
Kayelekera is one of five brownfield uranium projects on care and maintenance that historically achieved commercial uranium production of more than two-million pounds.

The project has a current resource of 37.5-million pounds of uranium and has significant existing infrastructure, including a 1.4-million-tonne-a-year processing facility, an on-site acid plant and an accommodation camp, allowing for a quick and low-capital restart to production.

A restart scoping study has highlighted the project’s potential to support a viable long-term operation in a favourable uranium price environment.

The study assessed two production scenarios, both of which assumed 97% of production from the measured and indicated mineral resource category.

Scenario 1 envisages the production of 16.4-million pounds of uranium and an average head grade of about 900 parts per million (ppm) of uranium over an eight-year life-of-mine (LoM). Only high-grade material is proposed to be processed.

Scenario 2 envisages the production of 23.8-million pounds of uranium over a 14-year LoM, with treatment of stockpiles from Year 8 at an average head grade of about 680 ppm uranium. Scenario 2 incorporates the lower-grade materials mined from the pit and contained on the existing surface stockpiles into the production schedule.

In both scenarios, mining continues for six years, after which plant feed is sourced solely from stockpiled material.

Processing at the project will incorporate conventional crushing, milling, high-density ion exchange (resin-in-pulp), membrane-based acid recovery and conventional yellow cake and tailings operations.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The project has a low initial capital cost of $50.2-million, owing to Kayelekera’s existing infrastructure.

Planned Start/End Date
Not stated.

Latest Developments
The Malawi government has renewed the mining and exploration licences for the Kayelekera project.

The mining licence has been renewed for 15 years.

Key Contracts, Suppliers and Consultants
Orelogy Mining Consultants (openpit optimisation and mine planning).

Contact Details for Project Information
Lotus Resources, tel +61 89 278 2441 or email info@lotusresources.com.au.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.048 1.268s - 111pq - 2rq
Subscribe Now