Kandiolé gold project, Mali

Name of the Project
Kandiolé gold project.
Location
Mali.
Project Owner/s
Canadian gold exploration company Roscan Gold Corporation.
Project Description
A preliminary economic assessment (PEA), published in March 2026, has proposed a conventional openpit mining operation supplying an estimated 2.5-million-tonnes a year to a centralised carbon-in-leach processing facility over an estimated 13-year life-of-mine (LoM). The current mine plan incorporates four deposits: Mankouke South, Mankouke Central, Kabaya and KN1.
Mining is planned as a conventional openpit truck-and-shovel operation under a contractor-mining model. Ore will be processed through a conventional crushing, grinding and carbon-in-leach circuit incorporating gravity recovery. LoM production metrics include total ore mined of 31.1-million tonnes, total waste mined of 118.1-million tonnes at a strip ration of 3.8:1. Recovered gold is estimated at 835 693 oz at an average processed grade of 0.89 g/t gold.
The project will require the development of supporting infrastructure, including hybrid diesel/solar power generation, site access roads, processing plant facilities, tailings storage facilities and water supply infrastructure.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
In the base case, the project has an after-tax net present value, at a 5% discount rate, of $498-million and an internal rate of return of 43%, with a payback of 2.8 years.
Capital Expenditure
Initial capital is estimated at $218.7-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Roscan Gold Corporation, tel +416 900 1412 or email info@Roscan.ca.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















