Kambalda nickel restart project, Australia – update

Location map of the Kambalda project

13th May 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kambalda nickel restart project.

Location
The Kambalda district of Western Australia.

Project Owner/s
Mincor Resources.

Project Description
A definitive feasibility study has proposed the development of a mining operation pro­duc­ing 63 000 t of recovered nickel-in-concentrate with relatively low capital intensity.

The initial five-year operation is based on 2.5-million tonnes of ore grading 2.9% nickel for 71 000 t of contained nickel-in-ore and 5 000 t of copper-in-ore.

The Mincor nickel operations are expected to comprise the Cassini and Northern operations (Long and Durkin North) at the start, with the Miitel mine contributing towards the latter half of the project life.

The flagship Cassini mine, a greenfield discovery by Mincor, is forecast to contribute 56% of the total nickel-in-concentrate production over the initial life of the project.

The mine plan involves underground extraction of the Cassini deposit through a boxcut and decline, mining 1.2-million tonnes of ore at an average nickel grade of 3.3% over five years.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 7% discount rate, of $305-million and an internal rate of return of 98%, with a payback of 12 months.

Capital Expenditure
Preproduction capital is estimated at $68-million, mainly associated with mine development and related infrastructure.

Planned Start/End Date
First nickel concentrate is scheduled in the June 2022 quarter, instead of late in the March 2022 quarter as previously guided.

Latest Developments
BHP’s Nickel West division has processed the first ore from ASX-listed Mincor Resources’ Kambalda operations through its Kambalda nickel concentrator, in Western Australia.

The milestone will result in Mincor’s delivering on its previous target of achieving first nickel concentrate production in the June quarter of this year, with first cash flow from the concentrates expected in June.

Mincor MD David Southam has said the successful recommissioning of the Kambalda nickel concentrator, which has been completed on time, is a significant milestone for both companies, and represents a significant boost for the Kambalda region.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Mincor Resources, tel +61 8 9476 7200 or email mincor@mincor.com.au.

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 
SafeQuip
SafeQuip

SafeQuip is a leading distributor and manufacturer of fire safety solutions, offering a comprehensive range of products designed to meet all...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.877s - 111pq - 2rq
Subscribe Now