https://www.miningweekly.com

KalNorth shuts down Lindsay's

2nd May 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

PERTH (miningweekly.com) – Junior miner KalNorth Gold Mines this week suspended openpit mining at its Lindsay’s mine, effective from the end of the June quarter, in response to the decreasing gold price.

The miner said that it had revamped the Lindsay’s mine plan in order to lower mining cost and improve profitability.

KalNorth would now accelerate the rate at which ore is mined from the Lindsay’s openpits, with the mine expected to yield some 165 000 t of ore, at 2.5 g/t for some 13 500 oz during the three months to June.

In addition, the strip ratio would decrease from the initial 17.1:1 to 7.4:1, which would result in a significant drop in mining costs, and an improvement in profitability, said KalNorth.

“Being able to respond in a timely manner to unforeseen events has shown that, even in this start-up phase, flexibility is an important asset to both the company and its long-term profitability,” said KalNorth MD John McKinstry.

He noted that while mining from the openpit would cease at the end of the June quarter, processing would continue at the Carosue Dam plant, at the existing rate of 25 000 t/y, through to December.

Any remaining ore would stay unmined, pending a rebound in the gold price.

McKinstry noted that the revised plan had resulted in an improved profitability, without detracting from the overall value proposition of KalNorth’s assets.

“We remain on track to advance plans for the next openpit mine at Kalpini, and to go underground at Lindsay’s,” he said.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Lilak Aluminium
Lilak Aluminium

For over 15 years, Lilak Aluminium, a trusted leader in architectural extrusion supply, has delivered excellence to businesses like yours.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.903s - 111pq - 2rq
Subscribe Now