Jwaneng modular tailings treatment project, Botswana
Name and Location
Jwaneng modular tailings treatment project (MTTP), Botswana.
Client
Debswana.
Project Description
An MTTP will be built at the Jwaneng mine.
A substantial volume of diamond tailings has been accumulating at the mine since operations began in 1983, before diamond recrush facilities were introduced.
The MTTP will treat 2.4-million tons of old tailings a year and is expected to yield 18-million carats over 20 years.
This will add 900 000 ct/y to Jwaneng’s current output of 13-million tons increasing it to 15-million tons a year.
The plant will serve as a pilot facility with the potential for deployment to other Debswana mines.
Value
The estimated capital cost of the project is $55-million.
Duration
Mechanical completion of the plant is expected in November and ramp-up in July 2014.
Latest Developments
The MTTP is expected to begin initial commissioning in the next few months.
Key Contracts and Suppliers
Firestone (financing, construction and operation of the plant) and ADP Projects (plant design).
On Budget and on Time?
The project was delayed in September 2010, three months after Debswana has approved the project. Delays have centred on Jwaneng’s Cut 8 project requiring site accommodation for longer than expected and the late issuing of issue-for-construction drawings.
Contact Details for Project Information
ADP Projects, tel +27 21 521 9400 or fax +27 21 521 9401.
Debswana, tel + 267 361 4200 or fax + 267 318 0778.
Firestone Diamonds (South Africa), tel +27 21 44 66 040 or fax +27 21 44 66 050.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation