https://www.miningweekly.com
Construction|Copper|Dewatering|Environment|Export|Infrastructure|Mining|Power|PROJECT|rail|Resources|Road|Roads|Storage|transport|Underground|Waste|Water|Power Generation|Power-generation|Infrastructure|Waste|Mine Water
Construction|Copper|Dewatering|Environment|Export|Infrastructure|Mining|Power|PROJECT|rail|Resources|Road|Roads|Storage|transport|Underground|Waste|Water|Power Generation|Power-generation|Infrastructure|Waste|Mine Water
construction|copper|dewatering|environment|export|infrastructure|mining|power|project|rail|resources|road|roads|storage|transport|underground|waste-company|water|power-generation|power-generation-industry-term|infrastructure|waste|mine-water

Jervois base metals project, Australia

29th November 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Jervois base metals project.

Location
The project is located about 17 km north-east of Orrtipa-Thurra (Bonya) community, in the Northern Territory, Australia.

Project Owner/s
KGL Resources.

Project Description
The Jervois mine is a brownfield site previously mined for base metals – copper, lead, zinc.

KGL plans to reopen the mine.

The project comprises:

∙ opencut and underground mining of base metal deposits of up to two-million tonnes a year;

∙ the processing and production of up to  150 000 t/y of copper and lead/zinc concentrate; and

∙ the transport of copper and lead/zinc concentrate in road trains to Alice Springs and the transfer by rail to Darwin and/or Adelaide Port for export.


The project includes the development of:

∙ mining infrastructure, including four opencut pits, three underground mines, a processing plant, waste-rock dumps and a tailings storage facility;

∙ water storage infrastructure, including the Jervois dam for mine water supply, a process water dam, an underground dewatering dam and five sediment dams;

∙ a borefield and a 48.5 km pipeline for water supply;

∙ a 1.7 km permanent diversion of Unca Creek and associated flood protection bunds; and

∙ supporting infrastructure such as roads, drainage, power generation and supply facilities, and an accommodation village.

Jervois has a mine life of ten years.


Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
Not stated.

Planned Start/End Date
Mine construction is expected to start in the second quarter of 2020.

Latest Developments
The Northern Territory Environment Protection Authority has recommended that the Northern territory government approve the Jervois project.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Lithium Americas, email info@lithiumamericas.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Rentech
Rentech

Rentech provides renewable energy products and services to the local and selected African markets. Supplying inverters, lithium and lead-acid...

VISIT SHOWROOM 
Booyco Electronics
Booyco Electronics

Booyco Electronics, South African pioneer of Proximity Detection Systems, offers safety solutions for underground and surface mining, quarrying,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.156 0.211s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: