https://www.miningweekly.com
Construction|Energy|Industrial|Infrastructure|Mining|PROJECT|Renewable Energy|Renewable-Energy|Solar|Trucks|Turbines|Underground|Equipment|Infrastructure|Turbines
Construction|Energy|Industrial|Infrastructure|Mining|PROJECT|Renewable Energy|Renewable-Energy|Solar|Trucks|Turbines|Underground|Equipment|Infrastructure|Turbines
construction|energy|industrial|infrastructure|mining|project|renewable-energy|renewable-energy-company|solar|trucks|turbines-company|underground|equipment|infrastructure|turbines-person

Jadar lithium-borates project, Serbia – update

Image of lithium drill core from the Jadar project

Photo by Copyright © 2023 Rio Tinto

26th April 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Jadar lithium-borates project.

Location
Near the City of Loznica, western Serbia.

Project Owner/s
Rio Tinto.

Project Description
In January 2022, the government of Serbia cancelled the spatial plan for the project and revoked Rio Tinto's licences pertaining to the proposed project.

Jadar was touted to be one of the biggest industrial investments in Serbia.

The proposed project would have produced battery-grade lithium carbonate, a critical mineral used in large-scale batteries for electric vehicles, and in storing renewable energy, and would have positioned Rio Tinto as the biggest source of lithium supply in Europe for at least 15 years.

The project was also expected to produce borates, which are used in solar panels and wind turbines. The development was expected to include an underground mine with associated infrastructure and equipment, as well as electric haul trucks and a beneficiation chemical processing plant.

Following ramp-up to full production, the mine would produce about 58 000 t/y of lithium carbonate, 160 000 t/y of boric acid and 255 000 t/y of sodium sulphate, making Rio Tinto one of the top ten lithium producers in the world. Based on this yearly production of lithium carbonate, Rio Tinto aimed to produce 2.3-million tonnes of lithium carbonate over the expected 40-year life-of-mine.

Potential Job Creation
The project will create 2 100 jobs during construction, and 1 000 mining and processing jobs once in production.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
In January 2022, the government of Serbia cancelled the spatial plan for the project and revoked Rio Tinto's licences pertaining to the proposed project. Rio Tinto had committed $2.4-billion to the project.

Planned Start/End Date
First saleable production was expected in 2027, with full production expected in 2029.

Latest Developments
Rio Tinto continues to believe that the Jadar project has the potential to be a world-class asset, which will support the development of other future industries in Serbia, acting as a catalyst for tens of thousands of jobs for current and future generations, and sustainably producing materials critical to the energy transition.

The company has indicated that it is focused on consultation with all stakeholders to explore options pertaining to the project's future.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Rio Tinto (Serbia), tel +381 15 872 834.
 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Comments

Showroom

SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 
Weir Minerals Africa and Middle East
Weir Minerals Africa and Middle East

Weir Minerals Europe, Middle East and Africa is a global supplier of excellent minerals solutions, including pumps, valves, hydrocyclones,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 03 May 2024
Magazine round up | 03 May 2024
3rd May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.335 0.395s - 93pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: