Iluka continues apace
PERTH (miningweekly.com) – Mineral sands miner Iluka has reported another solid quarter of production for the three months to September, with mineral sands production increasing to 289 100 t, from 265 300 t in the previous quarter.
Zircon production increased slightly from 101 300 t in the June quarter, to 106 300 t in the September quarter, while rutile production decreased from 31 400 t to 29 000 t, and synthetic rutile production increased from 49 800 t to 56 700 t.
Year-to-date heavy mineral concentrate production came to 317 000 t, with 782 000 t of heavy mineral concentrate processed during the September quarter, reflecting the company’s strategy to draw down inventory.
Year-to-date mineral sands sales increased to 451 600 t, generating revenues of A$472.6-million, which compared with the 415 000 t sold in the previous corresponding period and revenues of A$535.6-million.
Iluka said on Thursday that the lower sales revenue reflected lower zircon prices during the year-to-date, as well as a greater proportion of rutile and synthetic rutile in the sales mix.
Mining and concentrating activities at the Jacinth-Ambrosia operations, in South Australia, remained suspended, while the Hamilton and Narngulu operations, in Victoria and Western Australia respectively, continued to operate as planned at about 50% to 60% of capacity.
Iluka is planning to temporarily cease production of at lease one of its mineral separation plants in early November, over the Christmas period.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















