https://www.miningweekly.com

Hydro scheme cleared for danger

30th March 2016

  

Font size: - +

Skyriders  (0.04 MB)

The hydro project was established to deliver energy to the national grid at peak demand times using hydroelectric power. It consists of an upper and a lower dam, each capable of holding about 22 million square metres of water. During peak times, the water is released from the top dam, passing through the shafts into the bottom dam. In times of low demand, the shafts are used to pump the water back again.

A three-man team from Skyriders assisted with inspections of the shafts from 8 to 10 December 2015. Skyriders marketing manager Mike Zinn indicates that since all construction on the project has been completed, the next step was to hand over to an engineer for inspections. “We assisted with getting the engineer into each shaft safely, the final visual inspection of the shaft concerned and removing possible hazards such as debris and sand bags which could cause damage.”

The inspection of the whole shaft and its entire depth was done using rope access gear such as rope, headlights and battery-operated spotlights for clear visibility. “The shafts were well over 700 m long, 6 m in diameter and with 25 degree slopes. Although it was not easy getting inside the shafts, the project was finished on time,” adds Zinn.

Skyriders boasts extensive experience in all rope access applications. Its technicians are trained in various fields of rope access expertise. Zinn highlights that two senior technicians with Level 3 IWH certification, which is the highest level of rope access training, and one Level 2 technician, were sent out for the project. “One senior technician went down into the shaft with the engineer while the other two technicians were on standby rescue outside.”

Skyriders also provides structure inspections and installations, high-pressure cleaning, waterproofing, bolting /steel erection, welding, concrete inspection and repairs, and non-destructive testing. Due to its cost-effectiveness, flexibility and speedy expertise, Skyriders has become the preferred supplier of innovative height-related solutions.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.042 0.646s - 111pq - 2rq
Subscribe Now