https://www.miningweekly.com
AECOM|Business|Construction|Design|Engineering|Filtration|Industrial|Mining|PROJECT|Refining|Technology|Equipment|Environmental|Infrastructure
AECOM|Business|Construction|Design|Engineering|Filtration|Industrial|Mining|PROJECT|Refining|Technology|Equipment|Environmental|Infrastructure
aecom|business|construction|design|engineering|filtration|industrial|mining|project|refining|technology|equipment|environmental|infrastructure

HPA First Project, Australia

25th January 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
HPA First Project.

Location
New South Wales, Australia.

Client
Collerina Cobalt.

Project Description
A prefeasibility study (PFS) has delivered a compelling business case for the HPA First Project.

The project entails the application of Collerina’s licensed proprietary solvent extraction and refining technology to produce high-purity alumina (HPA) from an industrial feedstock.

The HPA First process is simpler than the original process flowsheet considered for the project, and does not require the development of a mining operation or associated acid plant, leach vessels, filtration plant, neutralisation circuits or tailings facilities.

The project will be able to sustain a production rate of 10 200 t/y HPA.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a payback of less than two years.

Value
The project is expected to cost about A$215-million to implement.

Duration
The project development and commissioning schedule includes a two-year construction period. For the purposes of the PFS, it has been assumed that the project will start construction in 2019, with initial commissioning expected in late 2021.

Latest Developments
Collerina has committed to immediately transition to a higher-confidence definitive feasibility study (DFS) to position the company to make a final investment decision.

The DFS is expected to be based on a pilot-scale processing plant, which will be built and run within Collerina’s Brisbane premises.

The pilot plant equipment has been drafted and orders placed for several long-lead items. The plant is scheduled to run from March to May 2019.

Key Contracts and Suppliers
Licensor and Pridentia (testwork development and process flowsheet); Prudentia (process engineering and design, site and surrounding infrastructure, cost estimates); Collerina/AECOM (environmental and community studies); Collerina/CRU (marketing); Prudentia, Licensor/Collerina (risk assessment).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Collerina Cobalt, tel +61 2 9300 3310.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
14th May 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.152 0.208s - 94pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: