Name of the Project
Houndé gold project.

Location
The project is located within the Birimian greenstone belt in Burkina Faso, just south of Semafo’s Mana mine and about 250 km south-west of the capital city, Ouagadougou, and benefits from excellent existing infrastructure.

Client
Houndé Gold Operation, Endeavour Mining’s Burkina Faso operating subsidiary.

Project Description
With its robust grade and low cash costs, Houndé ranks among West Africa’s highest-quality gold development projects.

Once in full production, Houndé is expected to become Endeavour’s flagship low-cost operation with a life-of-mine of more than ten years.

Endeavour Mining expects to produce an average of 190 000 oz/y at an all-in sustaining cost (AISC) of $709/oz over the life-of-mine. Over its first four years, Houndé’s average production is expected to be 235 000 oz/y at an AISC of $610/oz.

A 34% increase in the estimated mineral reserve has resulted in greater output expectations and a longer mine life.

The project has proven and probable reserves of 30.6-million tonnes, with an average grade of 2.1 g/t gold.

The updated mine plan defines a large-scale openpit mine that provides 29.7-million tonnes of ore at 2.15 g/t of gold and 251-million tonnes of waste for a strip ratio of 8.4:1.

The enhanced production relative to the November 2013 feasibility study is a result of the exploration additions from 2014 and an optimisation of the mine plan to access high-grade and shallow gold mineralisation during the initial years of the mine life.

The processing plant consists of a three-million-tonne-a-year gravity circuit/carbon-in-leach (CIL) plant with a semiautogenous (SAG) ball crushing comminution circuit.

Additional infrastructure includes the construction of the 38-km-long, 91 kV overhead power line.

Exloration potential
The Houndé exploration tenement covers more than 1 075 km2 within the highly prospective Birimian greenstone belt. Following a two-year period of no drilling, exploration activities will resume in 2017, with a $5-million programme totalling an estimated 45 000 m.

The focus will be on delineating high-grade targets, such as Bouere and Kari Pump, in addition to performing reconnaissance drilling.

Openpit prestrip mining at the main Vindaloo openpit, adjacent to the processing facility, also started in late 2016.

The enlarged reserve will result in total gold production of about 1.9-million ounces over a ten-year mine life, compared with the originally estimated 1.4-million ounces over an eight-year mine life.

Jobs to Be Created
More than 2 000 personnel, including contractors, are on site, of which more than 94% are Burkinabe. Notably, more than 2.7-million person hours have been worked without a lost-time incident, highlighting the company’s focus on safety.

Net Present Value/Internal Rate of Return
The internal rate of return has increased from the previously estimated 22.4% to 32% at a gold price of $1 250/oz.

The project’s after-tax net present value has been estimated at $359-million at the same gold price.

Value
The updated capital cost is estimated at $328-million, including contingency, working capital and import duties.

This represents a 3.2% increase over the $315-million estimate in the November 2013 feasibility study.

Duration
Engineering, procurement and construction are estimated at between 18 to 20 months from board approval to first gold production.
The Houndé project began construction in April 2016, with the first gold pour expected by the fourth quarter of 2017.

Latest Developments
The Houndé project is 85% complete, after receiving and starting installation of the SAG – the longest lead-time item.

All procurement has also been completed, reducing cost over-run risk, with less than $120-million out of the forecast $327-million total project capital expenditures remaining to be spent, representing less than 35% of the remaining budget.

To date, the SAG and ball mill plinths concrete have been completed, with components on site and being installed. The first cell of the tailings storage facility has been completed, with construction of the second cell under way, in parallel with an extension of the run-of-mine (RoM) pad.

The power station concrete civils is complete and the 90 kV overhead power line construction is 90% complete. Power from the national grid is scheduled for connection at the end of July.

Further, Endeavour has started openpit prestrip mining at the Main Vindaloo deposit. Ore mining has also started, with a mine plan to have 600 000 t of stockpiled ore on the RoM pad during plant commissioning.

Construction of the 300-person permanent accommodation village and resettlement has also been completed. 

The construction of the water harvest dam decant tower is also complete, with water being pumped to the water storage dam.

Meanwhile, Endeavour has restarted exploration drilling after a two-year hiatus, focusing on delineating high-grade targets, such as Bouere and Kari Pump, Sia, and Kari Fault, as well as performing reconnaissance drilling.

Endeavour owns 90% of Houndé, with the Burkina Faso government having a 10% free carried interest.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Construction is progressing as planned, with more than 65% of project construction completed, only a year after breaking ground.

First gold pour is expected in the fourth quarter of 2017.

Contact Details for Project Information
Endeavour Mining, tel +44 203 640 8665 or email info@endeavourmining.com.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.908s - 111pq - 2rq
Subscribe Now