Houndé gold project, Burkina Faso
Name and Location
Houndé gold project, Burkina Faso.
Client
Houndé Gold Operation, Endeavour Mining’s Burkina Faso operating subsidiary.
Project Description
A National Instrument 43-101 compliant feasibility study completed on the Houndé project in November 2013 proved positive for an openpit gold mine. A subsequent update on the project’s resources and reserves, mine plan and project economics was completed in February 2015.
A 34% increase in the estimated mineral reserve has resulted in greater output expectations and a longer mine life. The project has proven and probable reserves of 30.6-million tonnes, with an average grade of 2.1 g/t of gold.
An expansion of the Vindaloo deposit and the inclusion of two new deposits within 14 km of the proposed plant site have resulted in the Houndé mineral reserve increasing to 2.07-million ounces.
The enlarged reserve will result in total gold production of about 1.9-million ounces over a ten-year mine life, compared with the originally estimated 1.4-million ounces over an eight-year mine life.
The processing plant consists of a three-million-tonne-a-year primary crusher with a semiautogenous/ball crushing circuit to feed a gravity/carbon-in-leach plant.
The updated mine plan defines a large-scale openpit mine that provides 29.7-million tonnes of ore at 2.15 g/t of gold and 251-million tonnes of waste for a strip ratio of 8.4:1. The processing plant comprises a three-million-tonne-a-year primary crushing with a semiautogenous ball mill circuit to feed a gravity/carbon-in-leach plant. The enhanced production relative to the November 2013 feasibility study is a result of the exploration additions from 2014 and an optimisation of the mine plan to access high-grade and shallow gold mineralisation during the initial years of the mine life.
Net Present Value/Internal Rate of Return
The project’s internal rate of return has increased from the previously estimated 22.4% to between 28% and 35%, with a gold price ranging from between A$1 200/oz and A$1 300/oz. The project’s net present value has been estimated at A$359-million from an initial estimate of A$230-million.
Value
The updated capital cost is estimated at $328-million (inclusive of contingency, working capital, and import duties), representing a 3.2% increase over the $315-million estimate in the November 2013 feasibility study.
Duration
Engineering, procurement and construction are estimated at between 18 to 20 months from board approval to first gold production.
Latest Developments
The Houndé project has entered the first phase of construction after the approval of the board.
Meanwhile, Endeavour has indicated that rather than drawing on its revolving facility, its objective is to fund the remaining capital needs from free cash flow. It has, therefore, prudently implemented a short-term gold revenue protection programme to secure and derisk the necessary cash flows, providing comfort even if the gold price falls to $1 000/oz,”
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Endeavour Mining senior VP business development, Doug Reddy, tel +1 604 609 6114 or email investor@endeavourmining.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation