Honeymoon uranium mine, Australia

Name of the Project
Honeymoon uranium mine.
Location
South Australia.
Project Owner/s
Boss Energy.
Project Description
A front-end engineering design (FEED) study has highlighted a technically and financially robust project.
The FEED estimates an operation with nameplate production of 2.45-million pounds of uranium a year, over an initial 11-year mine life.
The FEED study assumes that the process plant is developed under an engineering, procurement, construction and management contract.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The FEED has confirmed that the Honeymoon project is economically robust, with an internal rate of return of 47% at a $60/lb uranium price.
Capital Expenditure
Based on the FEED study, the total capital estimate for the development of the project is A$113-million, including a contingency allowance of about 8%, which is within 6.6% of the enhanced feasibility estimate.
Planned Start/End Date
First uranium is expected to be produced at Honeymoon within 12 to 18 months of the final investment decision.
Latest Developments
A final investment decision is expected after the completion of the Tranche 2 placement on, or around May 5, 2022, whereafter the company will immediately start with detailed engineering, procurement and construction works.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Boss Energy, tel +61 8 6263 4494 or email boss@bossenergy.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation