https://www.miningweekly.com

Hochschild Mining first-half profit falls on lower silver prices

Ignacio Bustamante

Ignacio Bustamante

14th August 2019

By: Reuters

  

Font size: - +

Precious metals miner Hochschild Mining reported lower first-half pretax profit on Wednesday, as a drop in the average price of silver led to lower group production.

Hochschild's post-exceptional profit before income tax fell 23.5% to $29.5-million for the six months ended June 30, as the average price of silver fell 7%.

Hochschild said its first-half had the second highest attributable production in the company's history with 245 325 gold equivalent ounces (GEO)or 19.9-million silver equivalent ounces, compared with 256 939 GEO, or 20.8-million silver equivalent ounces last year.

"In mid-June, the gold price started to rise significantly on the back of global uncertainty and a fall in the US dollar and reached levels not seen in six years," CEO Ignacio Bustamante said.

Bustamante also said a rise in silver prices in July led the company to expect healthy second half cashflow generation, provided the price strength is maintained.

The Peru-headquartered miner said it was on track to meet its forecast for full-year production and all-in sustaining costs target.

Hochschild also reported adjusted core earnings of $153.7-million, beating company compiled consensus of $144-million, according to J.P. Morgan analysts.

Rival Fresnillo also trimmed its outlook for full-year gold and silver production and reported lower output for the two metals last month.

Edited by Reuters

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 
Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.882s - 110pq - 2rq
Subscribe Now