https://www.miningweekly.com
Construction|Industrial|Motors|PROJECT|Steel|supply-chain|Environmental
Construction|Industrial|Motors|PROJECT|Steel|supply-chain|Environmental
construction|industrial|motors|project|steel|supply chain|environmental

High-purity manganese sulphate monohydrate (HPMSM) facility, US – update

Image of managnese from the HPMSM project

Photo by Element 25

3rd November 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
High-purity manganese sulphate monohydrate (HPMSM) facility.

Location
Louisiana, in the US.

Project Owner/s
Element 25 (E25).

Project Description
A feasibility study has confirmed the viability of producing HPMSM for sale to local and international offtake partners, with an environmental impact that is significantly lower than that of incumbent producers to supply the rapidly growing electric vehicle (EV) supply chain in the US.

The project comprises a production facility capable of producing a nominal 65 000 t/y of battery-grade HPMSM per train for total production of 130 000 t/y.

The HPMSM plant will also produce reusable material in the form of a fertiliser feedstock, a ferrosilicon smelter feedstock suitable for use in steel production processes and a gypsum by-product for industrial use.

In addition to the Louisiana base case location, the feasibility study has also investigated the capital and operating costs for an alternative location in Sarawak, Malaysia. Extensive investigations have previously been undertaken at the site, and Element 25 is in advanced discussions with Malaysian government bodies and potential offtake and finance partners to build an HPMSM facility in the Samalaju Industrial Park.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 8% discount rate, of $1.66-billion and an internal rate of return 29%.

Capital Expenditure
Train 1 will require capital expenditure of $289-million, with an additional $187-million required for Train 2.

Planned Start/End Date
Not stated.

Latest Developments
General Motors (GM) has completed due diligence and accepted E25’s feasibility study as a condition of the definitive agreement announced between the companies on June 26, 2023.

E25 and GM signed a definitive agreement for E25 to supply battery-grade HPMSM to support GM’s EV battery requirements. In addition, GM will provide E25 with a $85-million loan towards financing the construction of its HPMSM processing facility, in the US, which will process manganese concentrate from E25’s Butcherbird mine, in Western Australia.

Remaining conditions include completion of product validation, securing the balance of the required project financing, finalising project permitting and executing the contracts with regard to the preferred plant site in Louisiana.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Element 25, tel +61 8 6375 2525 or email admin@e25.com.au.

Edited by Creamer Media Reporter

Comments

Showroom

John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (26/04/2024)
26th April 2024 By: Martin Creamer
Mining Weekly Editor Martin Creamer
Copper shares soar and green hydrogen goes digital
26th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.102 0.158s - 92pq - 2rq
1:
1: United States
Subscribe Now
2: United States
2: