High-purity alumina production plant, Canada
Name and Location
High-purity alumina (HPA) production plant, Quebec, Canada.
Client
Orbite Aluminae.
Project Description
The project involves the conversion of an HPA pilot plant into a state-of-the-art full-scale one-ton-a-day HPA facility, although the facility is expected to reach 3 t/d of HPA within 12 months of its commissioning without requiring further significant capital expenditure.
Value
The aggregate construction costs of the HPA production facility are expected to range between $26-million and $30-million.
Duration
The plant is expected to begin production in the first quarter of 2015.
Latest Developments
Construction of Orbite’s HPA plant is progressing on schedule, with components ordered from Outotec, in Germany, having arrived on site.
The company, which recently closed a $10-million financing deal with US institutional investor Crede Capital Group, says the German shipment represents about half of the total investment in the calcination system.
Components include a combination of refractory and solids-handling devices, as well as monitoring and control instrumentation.
Also expected to arrive at the plant site from Outotec’s facility in Burlington, Ontario, are preshaped refractory bricks. Progress on making the vessels for the calcination system at Outotec’s Burlington facility are also progressing on schedule, with all progress and quality inspection reports being positive.
The various components of the calcination system will be shipped to the Cap-Chat facility as scheduled.
Meanwhile, in preparing for commercial production, Orbite has hired seven process-control technicians for its HPA production facility to complement its operator’s team. The company says these technicians are the first graduates from the new AEC Operation and Control of Industrial Processes programme, offered in Sainte-Anne-des-Monts by Groupe Collegia, in collaboration with Emploi-Québec and Orbite.
The 16-month full-time programme started in February 2013 and was concluded with a 90-hour internship at Orbite’s Cap-Chat facility. The company also hired a locally based mechanical technician.
Key Contracts and Suppliers
Gastier (general contractor), Canam Group (design and construction of new building), Outotec (HPA calcination work) and Emerson Process Management (process control instrumentation).
On Budget and on Time?
The project is on schedule for commercial production in the first quarter of 2015.
Contact Details for Project Information
Orbite Aluminae, tel +1 514 744 6264 or fax +1 514 744 193.
Gastier, tel +1 514 325 4220.
Outotec, tel +358 20 529 211 or fax +358 20 529 2200.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation