https://www.miningweekly.com

High-purity alumina First project, Australia

Image of Australia map/flag

21st June 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
High-purity alumina (HPA) First project.

Location
Gladstone State Development Area, in Queensland, Australia.

Project Owner/s
Alpha HPA.

Project Description
The HPA First project will at scale be one of the largest HPA refineries in the world. The 10 ha state-of-the-art facility will leverage the established Stage 1 facility, and the latest in process control systems and automation, making it capable of producing 10 000 t/y of HPA equivalent.

Alpha HPA announced a final investment decision for the second stage of the HPA refinery in May 2024, on the back of a positive definitive feasibility study (DFS). The DFS is based on an annualised HPA product capacity of 10 430 t/y.

Potential Job Creation
Stage 1 is expected to create about 490 jobs during construction and more than 200 jobs upon completion.

Net Present Value/Internal Rate of Return
The payback period from first production for Stage 2 is estimated at 3.7 years.

Capital Expenditure
Stage 1 has a preproduction capital cost of A$308.13-million.

Stage 2 will cost A$553-million.

Planned Start/End Date
The project is expected to start construction in 2024 and will be operational in 2025. Construction of Stage 2 is expected to start in mid-2024, with first production scheduled for the first half of the 2027 financial year.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Prudentia Process Consulting (DFS and cost estimation); Prudentia and HPAlumina (pilot plant, engineering); and Aecom (permitting approvals).

Contact Details for Project Information
Alpha HPA, tel +61 2 9300 3310 or email info@collerinacobalt.com.au.
 

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 
MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.043 0.716s - 111pq - 2rq
Subscribe Now